PRODUCTION PART APPROVAL PROCESS (PPAP)

The PPAP process’s main benefit is that it allows identification of any weaknesses in the production process and assures that all customer engineering and design requirements are met. While developed initially by the Automotive Industry Action Group (AIAG), numerous other industries have adopted PPAP. PSP can include any document that’s specified in the PPAP manual. However, the most typically supplied documents are:

  • Failure Mode and Effects Analysis (FMEA): A report that identifies and corrects problem areas before production of parts
  • Process Flow Diagram: The control plan’s visual representation 
  • Control Plan: A step-by-step documentation of how the part is to be produced
  • Part Submission Warrant (PSW): An overall PPAP summary, including the approval form

PSP can currently provide every level of PPAP. Our most commonly requested PPAP’s are Level 4 PPAP (PSW plus customer specified documentation) and Level 3 PPAP (PSW plus all documentation).

INCOMING QUALITY INSPECTION

Incoming Quality Inspection

PSP has heavily invested in our incoming inspection process to assure utmost quality. More

PRODUCTION PART APPROVAL PROCESS (PPAP)

Production Part Approval Process (PPAP)

PPAP specifies requirements for new part startup or existing production changes. More

REGULATORY PRACTICES

Regulatory Practices

New laws and regulations increasingly impact the rubber sealing and fluid power industry. More

INTERNATIONAL MATERIAL DATA SYSTEM (IMDS)

International Material Data System (IMDS)

IMDS complies with the 2000/53/EC End of Life Vehicle Directive. More